Joint Construction/Capital Committee/Board Meeting, Monday, April 11, 2011 JTEL office, 7 pm Agenda: • review of questions/clarifications needed by USKH for design
• solidification of building vision
Questions/guidance needed from USKH, forwarded by Matt Prouty 4/7/11: A. Structural System 1. Foundation (Keep ICF?) 2. Wall System 3. Structural Skeleton (Timber Frame, Conventional Framing, etc…)
B. Interior Gantry Platform Construction Type
a. Metal b. Wood c. Supporting Structure
1. Hung from Ceiling 2. Supported on Post
C. Actual Size of Proper Thermal Storage Tank 5,000 gallons: Based upon the size of tank already in use at existing like sized passive solar structure.
D. Exterior Skin Material, Theme
E. Exterior Entry How this becomes more welcoming
F. Space Utilization 1. Children’s Space: Size, Location 2. Computers
a. Ensure the proper number of Computers b. WIFI (?)
3. Furniture: Type / Location 4. Kitchenette: Size
G. Occupancy and Code Review Limitation: Occupancy Load
H. Site: Connection between Gazebo and Library. |